The project is a continuation of the project 'Masonry and Indoor Climate'
The project is a continuation of the project 'Masonry and Indoor Climate'
The aim of the project is to establish an improved basis for assessing the capacity to even out the indoor air humidity in connection with sudden changes in the strength of interior moisture sources
for different wall types in buildings made from masonry, wood or concrete.
The project has 3 phases. In this connection the following milestones become significant:
- Detailed planning of the experimental work, including the selection of dwellings for experiments has finished.
- Data collection and computer simulation have finished.
- Analysis, workshop and report in Danish have been approved.
The termination of the project is planned to take place before July 2006.
Target group
Danish Heavy Clay and Lime Association of 1893
Project leader
The project is carried out in collaboration with
Technical University of Denmark
Commissioned by
Danish Heavy Clay and Lime Association of 1893
The project is organised in the Energy and environment